|
A two-component polymer mortar
Collect
Consultation Hotline:u0026nbsp;13925840771u0026nbsp;Manager Zhang 一.【Use】 1.Bridge structure steel wire rope (strand wire) mesh— The special mortar is matched with the polymer mortar external layer reinforcement method. antiu0026nbsp;Strippingu0026nbsp;away span>——The old and new interface is firmly combined, and the positive tension is high< /span>u0026nbsp; 二.[Features] antiu0026nbsp;< span style='padding: 0px; margin: 0px; text-align: left; transition: all 0.2s linear 0s; font-family: 宋体;'>冲u0026nbsp;Click——After pouring 1-3day flexural strength is as high as5MPa stickyu0026nbsp;sexualu0026nbsp;Good——Good mortar spreadability and quick construction Antiu0026nbsp;Oldu0026nbsp; 化——3000Hourly rapid test without appearance defects anti span>u0026nbsp;Frozenu0026nbsp;Sex——300 more than freezing and thawing No abnormality in the loop antiu0026nbsp;stripping< /span>u0026nbsp;离——The old and new interface are firmly combined, and the positive tension is high u0026nbsp;三.[Usage] u0026nbsp;add the recommended amount of water and stir into a mortar Can be painted or sprayed construction technical indicators (standard maintenance) 四.[Product Parameters] Five.【Construction Method】< /span> 1?Basic treatment: The surface of the base layer should be smooth, rough, clean, free of oil, dust, sand, hollow, cracks, etc. Before construction, use a high-pressure water gun to rinse and keep it in a damp state, but there must be no water. When the interface is bonded, the high-strength polymer mortar interface treatment agent can be painted in advance. 2?hanging the net: span> click The design requires cutting the mesh, installing the end pull ring of the steel strand, drilling, and fixing the steel strand net,Adjust the positioning. According to the mass ratio of the material to powder: emulsion =6:1 The weight ratio is weighed and placed. Change the actual usage amount90% Pour the emulsion into the mixing tank, and then add the powder to stir< /span>1~2 minutes. Then add the remaining10%Pour the emulsion into the tank and stir evenly. The prepared paste should be in0.5< /span>~1Use up within hours. Apply polymer mortar primer evenly on the surface of the wet concrete base (Powder: emulsion by weight ratio3:1), brush and rub together物mortar. The construction area of ??high-strength polymer mortar at one time should not be too large, and the construction should be staggered in sections and blocks. Each block should not be larger than10㎡, the staggered construction interval should not be less than24hours. In the layered construction, the positions of the remaining seams should be staggered. |