Now in Beijing, Zhengzhou, Shenyang, Chongqing and other production bases

Set Research and development, production, sales, technical services as one



24-hour hotline

13925840771

CN

Home >> Product >>Epoxy Mortar Series >> Modified epoxy polymer mortar
Product Detail

Modified epoxy polymer mortar

No price
Collect
  • DETAILS

Tel: 13925840771u0026nbsp; Manager Zhang
1. Features

·good compatibilitynon-toxic and environmentally friendly

·Strong bonding force, good adaptability to the old concrete base

·Good impermeability and protective properties for steel bars

·Can be used for wet base construction

Corrosion and acid and alkali resistance


two. Technical parameters

< td style='margin: 0px auto; padding: 0px; font-family: Times New Roman;' width='170' valign='top'>

2.35 Mpa

< td style='margin: 0px auto; padding: 0px; font-family: Times New Roman;' width='117' valign='top'>

Flexural strength (Mpa)

< /tr>

Project

< p style='paddi ng: 0px; margin: 0px auto; text-align: left; transition: all 0.2s linear 0s; word-spacing: -1.5px;'>performance indicators

Test results

Bonding strength

(Mpa)

7d

------

(7 7d) water resistance

------

2.02 Mpa

28d

≥2.5Mpa

2.76 Mpa

Compressive strength

(Mpa)

7d

------

30.00 Mpa

28d

≥55 Mpa

57 Mpa

28d

≥12 Mpa

13 Mpa


Note: The test blocks are respectively in PH=2 sulfuric acid solution, 2% Soaked in hydrochloric acid solution, 10% sodium hydroxide solution and saturated sodium oxide solution for one year, there is no shedding or leakage.


< p style='padding: 0px; margin: 0px auto; text-align: left; transition: all 0.2s linear 0s; font-size: 12px; font-style: normal; font-variant-ligatures: normal; font-variant -caps: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; -webkit-text-stroke- width: 0px; text-decoration-thickness: initi al; text-decoration-style: initial; text-decoration-color: initial; word-spacing: -1.5px; background-color: rgb(255, 255, 255); font-family: Verdana, Arial, Helvetica, sans -serif; line-height: 20px; color: rgb(85, 85, 85);'>Three. Usage

1. Repair of floor, panel and open-air sheet structure .

2. Repair of defects such as concrete honeycombs and holes, and Maintenance of underground pipelines, power plant water towers, chimneys, chemical plant structures and various corrosive gas plants and buildings with anti-corrosion requirements.

3. Used for 'road and bridge repair, leveling and reinforcement', 'wire rope Polymer mortar reinforcement method' uses special performance polymer mortar.


Four. Construction< /p>

【1】Basic treatment:

1. Remove the floating ash on the surface and remove the loose parts. There should be no clear water or a large amount of oil accumulation. If the base layer is sanded or the strength is low, the base layer should be hardened first.

2. When a construction area is large, the construction should be left Stagger construction of seams or pieces. The area of ??each block should not exceed 10~15m2, depending on the site environment. The gap time for seam repair or staggered construction shall not be less than 24h.

3. The construction temperature should be above 5℃, not at Construction in rainy or freezing weather.


【2】Material preparation:

Shake material A well before use, then mix it according to the mixing ratio of material A: material B=1:4 and fully stir it into a uniform paste before use . The reference dosage is 2000kg/m3, and the prepared materials should be used up within 1 to 2 hours.


< p style='padding: 0px; margin: 0px auto; text-align: left; transition: all 0.2s linear 0s; font-size: 12px; font-style: normal; font-variant-ligatures: normal; font-variant -caps: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; -webkit-text-stroke- width: 0px; text-decoration-thickness: initi al; text-decoration-style: initial; text-decoration-color: initial; word-spacing: -1.5px; background-color: rgb(255, 255, 255); font-family: Verdana, Arial, Helvetica, sans -serif; line-height: 20px; color: rgb(85, 85, 85);'>【3】Partial repair of defect:

according to project construction requirements, use a spatula Spread the prepared cement on the repaired area, and polish it while compacting it. It can be put into use 7 days after completion.


< p style='padding: 0px; margin: 0px auto; text-align: left; transition: all 0.2s linear 0s; font-size: 12px; font-style: normal; font-variant-ligatures: normal; font-variant -caps: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; -webkit-text-stroke- width: 0px; text-decoration-thickness: initi al; text-decoration-style: initial; text-decoration-color: initial; word-spacing: -1.5px; background-color: rgb(255, 255, 255); font-family: Verdana, Arial, Helvetica, sans -serif; line-height: 20px; color: rgb(85, 85, 85);'>【4】Large area overall surface plastering construction:

×
seo seo