One .Features
·High strength,scouring resistantu0026nbsp;·no shrinkage, slight expansion
·high temperature and thermal shock resistanceu0026nbsp;·low price and convenient transportation< br/>Technical parametersu0026nbsp; u0026nbsp;u0026nbsp;Executive standard: JC/T906-2002
Main technical performance indicators
< span style='padding: 0px; margin: 0px; text-align: left; transition: all 0.2s linear 0s; font-family: Verdana, Arial, Helvetica, sans-serif; font-size: 18px;'>
two. Purpose·Inner lining of slag ditch, ore trough, silos, etc. in metallurgy and mining systems.
·Inner linings of coal unloading troughs, coal hoppers, silos, etc. in coking, coal, electrical systems .
·Chemical building materials (cement, etc.) system silo, hopper, warehouse wall, etc. lining.
· Water conservancy, hydropower, ports, docks and other anti-scouring and anti-wear surface layers.
Three. Construction
< p style='padding: 0px; margin: 0px; text-align: left; transition: all 0.2s linear 0s; color: rgb(102, 102, 102); font-size: 12px; font-style: normal; font -variant-ligatures: normal; font-variant-caps: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-indent: 0px; text-transform: none; white-space: normal; widows : 2; -webkit-text-stroke-width: 0px; text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; word-spacing: -1.5px; font-family: u0026quot;microsoft yaheiu0026quot;, Times New Roman; background-color: rgb(255, 255, 255);'>
·Basic treatment:Clean up The surface of the base layer, and the original surface layer is fully sandblasted or chiseled. The surface of the concrete base layer shall be fully wetted 24 hours before construction, and the accumulated water shall be removed 1 hour before construction.
·Material preparation:
According to the recommended water consumption on the product certificate provided with the goods, mechanical mixing is recommended. The mixing time is generally 2 to 3 minutes. The mixing location should be as close as possible to the construction site , Reduce the transportation distance.
·Smoothing and calendering:
Use a steel spatula for layered construction, and the thickness of each layer should not exceed 30mm. After finishing, use a steel spatula for calendering and leveling 3~5h.
·Maintenance:
After calendering and leveling, immediately cover with a wet grass bag or rock wool quilt within 30 minutes, and keep the surface moist for at least 7 days.
4. Packaging and storage
50 kg/bag, stored in a dry, ventilated environment, waterproof and moisture-proof, the shelf life is 6 months. 